Pumphouse Pipe Diversion

Duffy Contractors were requested to remove existing effluent waste pipe and reinstate new pipe with ‘T’ piece for future expansion at a large confidential facility. Waste pipe operation could not be interrupted during works resulting in over pumping being implemented for duration of pipe change.

Scope of Works:

  • Civils excavation to existing pipe and remove pipe
  • Over pumping of effluent waste for duration of works
  • Factory critical pipework- operations could not be interrupted
  • Provision of back up pumps, generators and lights for 24/7 operation
  • Silt traps and environmental considerations for adjacent river
  • Install new pipe and ‘T’ Piece for future expansion
  • Formwork and install of concrete support blocks
  • Supply and install of manholes
  • Backfill, blinding and landscaping

Project Details:

Client: Confidential

Design Team: Confidential

Value: €400,000

Time frame: 3 months